Massive power failure cripples Kolkata

Image
Press Trust Of India Kolkata
Last Updated : Jan 19 2013 | 11:37 PM IST

All the four units of the CESC, which supplies electricity to the metropolis, tripped simultaneously in the afternoon today, leading to a massive power failure causing suspension of the Metro services and the emergency services in hospitals.

The four power generating stations -- Budge Budge, Titagarh, Kashipur and Southern generating station -- which have a combined capacity of 980 MW tripped together at 16.45 hours, CESC executive director D Sen said.

Sen said the engineers and top officials of the private utility were trying to locate the fault and restore the power supply.

He claimed, "Things are coming back to normal."

The power outage forced Metro services to be suspended between 16.42 hours and 16.48 hours, a Metro Railway spokesman said. Most hospitals were also left without their emergency services due to the disruption in the power supply.

Asked what caused the tripping, Sen said they were yet to pinpoint the reason as their priority now was to quickly restore the supply.

More From This Section

First Published: Apr 20 2009 | 12:30 AM IST

Next Story