Don’t miss the latest developments in business and finance.

Suzlon Energy bags 50.4MW order from GSFC

Image
BS Reporter Mumbai
Last Updated : Jan 20 2013 | 2:02 AM IST

Suzlon Energy today announced the signing of an order with Gujarat State Fertilizers & Chemicals (GSFC) to set up, operate and maintain wind energy projects totaling to 50.4 MW in Gujarat.

“The projects, utilising 24 units of Suzlon’s S88–2.1 MW wind turbine, will be set up in wind farms operated by Suzlon in the Rajkot and Surendranagar districts of Gujarat. This is GSFC’s fifth order with Suzlon and is scheduled for completion and commissioning by September 2011,” one of the world’s leading and India’s largest wind turbine manufacturer said in a filing to the stock exchanges.

GSFC is a leading state Public Sector Undertaking (PSU) in Gujarat in the field of fertilizers and chemicals.

At 10.04 am, Suzlon Energy stock was trading up 1% on the National Stock Exchange (NSE).

More From This Section

First Published: Apr 20 2011 | 12:00 PM IST

Next Story