Just one month into the monsoon and Mumbai local is struggling to weather the season. Heavy rains have affected rail services on both routes of the Central Railway. Indian Railways is, however, now ready with a plan to provide life support to Mumbai's lifeline during the monsoon season. Over 7 million daily suburban train commuters witness frequent disruption in services due to water logging on the railway tracks. Central Railway is set to roll out a modified 'waterproof' locomotive engine that can be operated even in 12 inches of water. Generally, a locomotive engine stops with only four inches of water, forcing the train to stay until the water on the railway tracks recedes.
According to a railway official, the modified 'waterproof' locomotive engine can move local trains as well as long-distance trains that get stuck on railway tracks due to water-logging during heavy rainfall.
Only one locomotive engine has been modified yet and there are plans to modify one more engine, an official told Business Standard. "This loco can be pressed in shunting duties to clear the marooned or defective rakes from tracks to clear path for the resumption of suburban services in shortest possible time," the official said.
Major problems commuters face
Waterlogging at many stations including Kurla, Sion, Parel, Matunga and Dadar
Delay of trains
CR Services shutdown after heavy rainfall that leads to cancellation of trains without intimation
Overcrowding at platforms and foot-over bridges
Trains get stuck on tracks due to heavy rainfall
Monsoon woes for the railways
There is a problem of coaches, local trains and other rolling stocks getting marooned during monsoon in Mumbai area due to waterlogging. Clearing of these marooned rolling stocks takes a lot of time since engines are not fit to run above 4 inches of water. Water enters into traction motors of the engine, thus causing engine failure.
The Railways' new 'waterproof' engine
According to a news agency, last September, heavy rainfall had marooned 25 rakes as water on railway tracks had entered traction motors of the locomotive engines. In order to keep the local trains running, these rakes were required to be repaired or replaced. The rakes had to be put out of service as they were full of water and it took 5 days to make them functional again.
A railway official said that Kurla based WDS6 Diesel Engines are being modified to run in 12 inches of water level by modification of Traction motors at shed level so that the marooned rolling stock can be cleared in lesser time. The modified locomotive engine can move local trains as well as long-distance trains that get stuck on tracks due to water-logging.
Only one locomotive engine has been modified until now
How is the modification done?
The modification is done by sealing motors completely so as to avoid any water entry. Temperature sensors are used to check the increase in the temperature of the motor. This modification is of great use for Mumbai area as every year Mumbai faces the problem of various rolling stocks getting stuck at the same place until water level comes down.
There are plans to modify one more engine
To read the full story, Subscribe Now at just Rs 249 a month