Hon'ble Supreme Court of India in its judgment dated 25.08.2014 and order dated 24.09.2014 passed in W.P.(Criminal) No.120 of 2012 and other connected matters has declared all allocations of the coal blocks made through Screening Committee and through Government Dispensation route since 1993 as illegal and has cancelled the allocation of 204 coal blocks out of 218 coal blocks (i.e. except, Tasra coal block allocated to Steel Authority of India Ltd. and Pakri Barwadih coal block allocated to National Thermal Power Corporation and 12 coal blocks allocated for Ultra Mega Power Projects). In case of 42 coal blocks (37 producing and 05 likely to come under production), cancellation shall take effect from 31.03.2015. This was stated by Sh. Piyush Goyal, Minister of state for Power, Coal & New and Renewable Energy (Independent Charge) in a written reply to a question in the Lok Sabha today.