The Government has a proposal to Scale up Grid Connected Solar Power Projects from 20,000 MW to 1,00,000 MW by 2022 under National Solar Mission (NSM). The plan of action to achieve the target is under preparation. This was stated by Sh. Piyush Goyal, Minister of state for Power, Coal & New and Renewable Energy (IC) in a written reply to a question in the Rajya Sabha today.