Power generating capacity in the country at the end of the Eleventh Plan (as on 31.03.2012) was 1,99,877 MW and during Twelfth Plan it is 2,55,012 MW (as on 30.11.2014). This was stated by Sh. Piyush Goyal, Minister of State (I/C) for Power, Coal & New and Renewable Energy in a written reply to a question in the Lok Sabha today.