Aggregating Rs 650 crore
BGR Energy Systems has secured two contracts aggregating Rs 650 crore marking its foray into large size water treatment.It has received a contract worth Rs 209.50 crore from Andhra Pradesh Power Development Corporation for manufacture, supply, erection and commissioning of water treatment plant package for 1x800 MW Krishnapatnam Project, Stage 1 (2x800 Mw) unit 1 and 2 and 1x800 MW Stage 2, Unit 3.
The second order is from Chennai Metropolitan Water Supply and Sewerage Board to design, build, operate and maintain 45MLD capacity Tertiary Treatment Reverse Osmosis plant at Kodungaiyur including supply and laying of DI transmission mains for conveyance of product water to various industries in Manali area, Chennai for value of Rs 440 crore.
Powered by Capital Market - Live News
Disclaimer: No Business Standard Journalist was involved in creation of this content