In Rwanda
Bharat Heavy Electricals announced the construction and successful commissioning of 28 MW Nyaborongo Hydro Electric Project (2x14MW) in Rwanda, on turnkey basis. Both the generating units of this project were synchronised with the grid and with the commissioning of the project; the installed generating capacity of Republic of Rwanda has gone up by 24% from 119MW to 147 MW.Powered by Capital Market - Live News