The project is for four laning of NH-363 from Repallewada (Design Km 42.000 /Existing Km 288.510) to Telangana/Maharashtra Border (Design Km 94.602/Existing Km 342.000) (Design Length = 52.602 Km) in the State of Telangana under NH (O) on Hybrid Annuity mode (HAM). The company bid project cost of Rs 1140.5 crore.
Powered by Capital Market - Live News