Status of National Highway Projects in Uttar Pradesh
In the State of Uttar Pradesh there are 60 National Highways with total length of 8483 Kms, out of which 4529 Kms are with NHAI and 3143 Kms with State PWD. NOC is awaited for 10 Nos NHs with 811 Kms.8 Major Projects having a length of 865 Kms amounting to Rs. 6218 Crs were completed in the past 2 years.
31 Major Projects are ongoing with a total length of 2156 Kms with total TPC of Rs. 19,436 Crs.
24 Major Projects were awarded during 2014-15 & 2015-16, with a total length of 1293 Kms and total TPC of Rs. 16,949 Crs
15 projects are likely to be awarded in the next 12 months with a length of 840 Kms with TPC of Rs.6790 Crs.
1400 Kms of National Highways are under DPR and Civil construction work likely to be awarded in the next two years for approx cost of Rs. 14,000 Crs.
More From This Section
Under CRF and ISC Schemes a total number of 79 Projects have been sanctioned amounting to Rs. 3035 Crs during 2015-16 & 2016-17.
10 Number of new National Highways in the Uttar Pradesh state have been declared with a length of 811 Kms. (DPR invited by the Ministry)
35 Nos of NHs with 2591 Kms length have been approved ' in-principle ', MORTH shall invest an amount of approximately Rs. 25,910 Crs to develop these National Highways, subject to the outcome of DPR / receipt of NOC from the State Govt
In totality, MORTH, through NHAI and State PWD, shall invest approximately an amount of Rs. 74,794 Crs in the State in next two years.
The details of the above projects can be seen in the 13 tables that follow
Table 1 : Details of NHS in Uttar Pradesh
S. No.Details of NH
Length (Km)i.Total NH length (60 nos including newly declared NH)
8483 ii.NH length entrusted to NHAI
4529iii.NH length entrusted to PWD
3143 iv.Length of newly declared NHs but NOC from State PWD yet to be received (10 nos )
811 v.Length of 'In Principle' approved National Highways. (35 nos)
Total length
11,074 KmTable 2: Density of NHs
Sl. No.NH density in respect of population and area
NH densityUttar Pradesh All India(i)Length (in Km./1000 Sq Km of area)
34.87 (Area=243286 Sq Km) 28.25 (Area=3287263 Sq Km)(ii)Length (in Km./Lakh of population) (As per 2011 Census)
4.25 (Population=1996 Lakh) 7.67 (Population=12102 Lakh)Table 3: Lane distribution of entrusted NHs [7672 Km = 8483 - 811]
S.noLane Distribution
% age i.4 Lane and above
28%ii.2 Lane
69%iii.Less than 2 Lane
3%Table 4: Details Of NH Works In The State Of Uttar Pradesh
S.No.Programme / Plan
Projects Awarded in 2014-15 & 2015-16
24 1293.29 16948.812Projects completed during last 2 years
8 864.97 6217.39Ongoing Major Projects
31 2156.87 19436.422Projects in pipeline
15 839.72 6789.823DPR under preparation
1400 140004CRF & ISC likely to be awarded during 2016-17
79 1706.65 30355New National Highways Declared
10 811 81106National Highways declared "In Principle"
35 2591 25910Total Estimated / Projected investment in UP since May 2014.
8641.66 74793.63Table 5: Major projects completed during last 2 years. Major Projects costing > Rs.100 Crs.
Sl. No. NH Work Mode LengthTPC/ Civil Cost (Rs. In Cr) Remark/Substantial completion 1 24B 4-laning of Lucknow-Raebareilly section BOT (Annuity) 70 635 Completed in Jan, 20152 93 2 Laning with Paved Shoulder of Agra - Aligarh Section BOT (Toll) 81.4 250 COD for 81.4 km issued in Aug, 20153 24 4 laning of Moradabad - Bareilly BOT (Toll) 121 1267 COD for 118.8 km issued in Nov, 20154 93 4/6 laning of Ghaziabad - Aligarh BOT (Toll) 126.3 1141 COD for 103.89 km issued in June, 20155 25 Unnao ROB and approaches of Lucknow Kanpur section EPC 16.2 53.52 ROB completed and opened for traffic on 23, June, 20156 86 2 laning with paved shoulder of Kanpur - Kabrai Section BOT (Toll) 123.86 373.47 COD for 123.86 km issued in July, 20157 2 6-laning of Etawah - Chakeri section BOT (Toll) mode BOT (Toll) 160.21 1928 6-laning completed for 159.71 km in Sept, 15 8 231 2laning with PS of Raebareilly - Jaunpur on BOT Annuity mode. BOT (Annuity) 166 569.4 Completed in Feb, 2016
Total
TPC: Total Project Cost
COD: Commercial Operation Date.
Table 6 : Ongoing Major Projects: Physical and Financial progress
(a) Projects under NHAI
Sl. No.NH No. Work Length (km) TPC/ Civil Cost (Rs. Crore) Date of Start Stipulated Date of Completion Status (Present physical progress)1 25 Jajmau Ganga Bridge to Rama Devi Crossing 5.46 201.66 Dec, 05 Dec, 08 94% in Progress2 2&3 Construction of new 4 Lane Agra Bypass(EPC) 32.2 465.5 Jul, 11 Jul, 14 85% in progress3 24 4-laining of Moradabad - Bareilly Section on BOT (Toll) mode 121 1267 Dec,10 June,13 98.6% in progress. (PCOD issued for length of 118.820 km.) Only 1.7 km remains to be completed. Delay to LA problem.4 24 4-laning of Bareilly - Sitapur sec on BOT (Toll) mode 151.2 1046 March, 11 Aug, 13 44% in Progress5 2 6-laning of Etawah - Chakeri section BOT (Toll) mode 160.21 1573 Mar, 13 Sep, 15 99% (6-laning work is completed and balance work viz service road, drains etc at few locations left due to slow progress in LA award)6 91 Ghaziabad to Aligarh (Km 23.600 to Km 140.200) BOT (Toll) mode 126.30 1141 Feb, 11 Aug, 13 96%(PCOD issued for length 103.89km on 23.06.15 7 24B 2-laning with PS of Rbly - Allahabad section on BOT (Toll) mode 106.6 291.4 Jul, 12 Jan, 14 58% in progress8 2 6-laning of Delhi - Agra section on BOT (Toll) mode 179.5 1928 Oct, 12 Apr, 15 51% in progress9 232 2laning with PS of Tanda - Raebareilly on EPC Mode. 155 636 Apr, 14 Oct, 16 70% in progress10 232 2laning with PS of Raebareilly - Banda on EPC Mode. 133 429 Apr, 14 Oct, 16 58% in progress11 56,29 4-lane Varanasi Bypass (Phase-I) on EPC Mode. 16.55
(b) Projects under NHDP IV Zone of MORT&H
(c) Projects under Uttar Pradesh PWD & PIU of MORT&H
Table 7 : Projects awarded in 2014-15 & 2015-16:
Widening with Paved shoulders & Strengthening from Km.0.00 to 50.675 of NH-730A EPC MODE
50.675 164.542Strengthening with provision of paved shoulder in km. 0.00 to 46.470 of NH-96(330) EPC MODE
46.47 227.743Widening & strengthening from km.505.00 to 538.00 of NH-730 (EPC MODE)
33.00 207.884Widening & strengthening from km. 454.00 to 470.90, 474.00 to 484.00 of NH-730 EPC MODE
26.90 138.445Constn. for four laning of Babatpur-Varanasi section of NH-56 (231) Km 263.00 to 280.25 (EPC MODE)
17.25 753.576Construction of Ring Road for Raebareli City (Phase -I) on Eastern side of NH 24B
17.927 302.737Widening to two lane with paved shoulder from Km.51.000 (50.675) to 105.500 of NH-730A on EPC mode
54.43 298.33Sub-total A
246.652 2093.23NHDP-IV executed by state PWD8Barabanki to junction with MDR 13 near Jarwal section of NH-28C in Uttar Pradesh km 0 to 43
42.45 358.479Junction with MDR-13 near Jarwal to Bahraich section of NH-28C in Uttar Pradesh km 43 to 93
50.49 337.5810Bahraich bypass to Rupaidha section NH-28C in Uttar Pradesh km 99 to150
53.85 437.9211Sonouli to Gorakhpur section of NH-29E in Uttar Pradesh km 0/0 to 80/0
81.412 569.3412Indo-Nepal Border to Rudhauli section of NH-233 in Uttar Pradesh km 0/0 to 65/870
65.87 551.4813Rudhauli to Ghagra Bridge section of NH-233 in Uttar Pradesh km 65/870 to 122/270
54.36 550.9314Four laning of Allahabad to UP/MP Border section of NH-27
41.34 774.5715Gorakhpur bypass from existing km 79.670 of NH-29E to existing km 251.700 of NH-28
18.25 531Sub-total B
408.022 4111.29NHDP-IV executed by NHAI16Construction of 4-lane Varanasi Bypass connecting NH-29 and NH-56 (Phase-I) on EPC Mode.
16.550 261.00174-laning of Ghaghara Bridge to Varanasi section from km 121.800 to km 180.420 (Pkg-I) on EPC Mode.
58.635 674.34184-laning of Ghaghara Bridge to Varanasi section from km 180.420 to km 240.340 (Pkg-II) on EPC Mode.
59.947 741.00194-laning of Ghaghara Bridge to Varanasi section from km 240.340 to km 299.350 (Pkg-III) on EPC Mode.
59.070 785.00206 laning of Agra to Etawah Bypass section from km 199.660 to km 323.525 on BOT (Toll)
124.520 1650.20214-laning of Sultanpur to Varanasi section of NH-56 from km 134.700 to km 205.000 (Design Ch. 209.230) (PKG-1) on EPC Mode.
74.53 986.000224-laning of Sultanpur to Varanasi section of NH-56 from km km 205.000 to km 263.000 (Design Ch. 272.590) (PKG-2) on EPC Mode.
63.36 806.000236-lane Eastern Peripheral Expressway around Delhi
135 3991.4324Construction of Delhi - Meerut Expressway
45 849.32Sub-total C
636.612 10744.29Total (A+B+C)
1293.29 16948.81Table 8: Projects in pipeline:
Sl No Name of the Project Length (km) Cost (TPC in Crore)NH(O) Projects executed by State PWD1Widening of existing single lane carriageway to two lane carriageway with paved shoulder and strengthening from Km.51.000 (50.675) to 105.000 of NH-730A
54.43 298.332Rehabilitation and Up-gradation of Bahraich-Shrawasti section (Km.248.40 to 310.00) of NH-730 in the State of Uttar Pradesh to two lanes with paved shoulder on EPC mode
61.90 388.833Rehabilitation and Up-gradation of Harpalpur - Sugira section (Km.89.600 to 133.520) of NH-76 (New NH No.339) in the State of Uttar Pradesh to two lane with paved shoulder under EPC mode
41.47 208.504Rehabilitation and Up-gradation of from Km.285.000 to 326.000 of NH-76 (Kalupur-Lalata road) to two lane with paved shoulder on EPC mode in the State of Uttar Pradesh
41.25 240.305Rehabilitation and Up-gradation of Lakhimpur -Sisiya section (Km.140.00 to 188.80) of NH-730 to two lanes with paved shoulder on EPC mode in the State of Uttar Pradesh
48.80 296.506Rehabilitation and Up-gradation of Sultanpur - Pratapgarh section of NH-96 from existing km 60/000 to km 90/000 [Design Ch. 60.000 to Ch. 90.865] to Two lane with paved shoulders on EPC mode in the state of Uttar Pradesh
30.87 208.887Rehabilitation and Up-gradation of Tulsipur- Barhani Section (Km 351+000 to Km 385+000) of NH-730 to two lane with paved shoulder under EPC mode in the State of Uttar Pradesh
34.00 249.508Rehabilitation and Up-gradation of Sisiya-Nanpara section (Km.188.8 to 226.100) of NH-730 in the State of Uttar Pradesh to two lanes with paved shoulder under EPC mode
37.46 213.519Rehabilitation and Up-gradation of Pratapgarh to Allahabad Bypass road junction section of NH-96 from existing km 100+800 to km 135+230 [Design Ch.100+800 to Ch. 135+500] to four lanes with paved shoulders on EPC mode in the state of Uttar Pradesh
34.70 599.3410Rehabilitation and Up-gradation of Puranpur - Khutar section (Km38.000 to 82.000) of NH-730 in the State of Uttar Pradesh to two lanes with paved shoulder under EPC mode
44.13 225.96Sub-total A
429.01 2929.6511Aligarh-Moradabad
146.37 503.3412Meerut - Buldandshar
61.19 609.7213Varansi-Gorakhpur (Pkg-II)
72.15 856.6414Varansi-Gorakhpur (Pkg-III)
65.38 852.3215Varansi-Gorakhpur (Pkg-IV)
65.62 1038.15Sub-total A
410.71 3860.17TOTAL
839.72 6789.82Table 9 :DPR Under Preparation:
Sl NoName of the Project
Length (km) Cost (TPC in Crore)NH(O) Projects executed by State PWD1 DPR of remaining stretches of NH-76, NH-730, NH-330A, NH-19, NH-119 700 7000NHDP-IV executed by NHAI24-laning of Aligarh-Kanpur section of NH-91 under NHDP Phase-IV on BOT (Toll) mode
282 km 3Lucknow Ring Road under NHDP Phase-VII
100 km 4Varanasi Ring Road (Phase-II) under Phase-VII
43 km 52-laning with paved shoulders of Varanasi-Hanumanha section of NH-7 under NHDP Phase-IV on EPC mode
125 km 66-laning of Hapur bypass-Moradabad section of NH-24 under NHDP phase-V
100 km 72-laning with paved shoulders of Unnao-Lalganj section of NH-232A under NHDP Phase-IV on BOT (Annuity) mode
50 km 700 7000Total
1400 14000Table 10 : List of CRF works:
Sl NoName of the proposal
Length in Km. Modified cost by Ministry1.Widening and strengthening OF Kairana-Khatauli road from Km.33.000 to 47.900 (MDR)
14.90 28.312.Bhitaura- bahedi road (ODR) from Km 1.000 to 42.800, comprising of widening and strengthening work from 3.75 m to 7 m (two laning).
41.80 77.933.Sishgarh-bahedi road(ODR) from km 1 to 20, comprising of widening and strengthening work from 3.75 m to 7 m (two laning)
20.00 36.684Widening and strengthening of Baha-Udi road from Km.22 to 30
9.000 18.835Widening and strengthening of Udi-Chakarnagar-Bareh road
42.300 94.406Widening and strengthening of Barkheda-Daolatpur-Uganpur-Suhas road from Km 0.000 to 20.650
20.650 48.087Strengthening of Gawan -Anupshahar road from Km 0.000 to 9.390
9.390 12.248Widening and strengthening of Widening & Strengthening of Babrala-Anupshahar road from Km 0.00 to Km 16.630
16.630 14.489Widening & Strengthening of Rajpura-Tikata-Bahjoi road from Km 0.00 to 24.800
24.800 36.3210Widening & Strengthening of link road connecting Km 193 of NH-93 (Chandausi) via Ata-Mauassu-Naglia ballu-Tharaisa Jai Singh up to Pawasa from Km 0.00 to 17.00
17.000 26.7511Widening & Strengthening of road connecting Km 158 of Meerut Badaun road to Mithunpur via Ghonsli raja (Km 0.00 to Km 11.850)
11.850 20.1412Widening & Strengthening of link road from Sahaswan Nadha to Pathakpur via Ghari Khanpur from Km. 0.00 to 8.000
8.000 14.8413Widening & Strengthening of Kanth - Mishripur - Begampur - Karanpur - Rattupura - Thakurdwara - Jaspur Road (KMBK road from Km 0.000 to 13.600, KRSJ road from Km1.000 to 8.000, TR road from Km 1.000 to 8.000 and TJ road from Km 0.000 to 5.000).
33.700 67.8014Widening & Strengthening of Dalpatpur - Aliganj from Km 0.000 to 42.000
42.000 64.2715Widening & Strengthening of Bisalpur - Bilsanda Gola road from Km 1.580to 21.000.
19.580 21.7816Widening & Strengthening of Nawabganj - Dalelnagar- Vaharjagit- Barkheda road ( Barkheda-Nawabganj road) from Km 16.000 to 19.750
3.750 10.0217Widening of Bisauli- Aonla road from Km.0.000 to 14.000
14.000 12.3918Widening & Strengthening from Gandinagar Jamo road to Jodhnapur Madka via Barouliya
6.575 8.6419Strengthening of Jais - Mohanganj road from Km 0.000 to 17.000
17.000 22.5720Strengthening of road from Varisganj to Devkali Chauraha via Raniganj from Km 0.000 to 10.000) ( Varisganj-Shukulbazar-Subeha road)
10.000 11.0921Strengthening from road Km 2 of Sourikh-Daulatabad road to Behatarampur -Kairda Vishungad road (Km 0.00 to 10.00)
10.000 20.9322Widening & Strengthening of Raebareli-Gurubakshganj-Kheri-Semri road from Km 5.800 to Km to 42.300
36.500 68.5223Widening & Strengthening of Lalganj-Semarpaha-Ralpur road Km 7.00 to 19.600
12.600 19.7324Widening & Strengthening of remaining portion of Raebareli-Dalmau-Fatehpur road (Km 0.00 to Km 2.953)
2.953 3.1225Widening & Strengthening of Dalmau-Jagatpur road from Km 3.600 to Km 26.000
22.400 35.6526Widening & Strengthening of Jahanabad Richa road from Km. 0.00 to 10.000
10.000 14.6227Widening & Strengthening of Puranpur Diyoriya Kalan road from Km. 30.00 to 44.720)
14.720 33.0328Widening & Strengthening of Bareilly Bisalpur road from Km 26.000 to Km 40.800
14.800 27.9729Strengthening of Bilraya-Panwari road from Km 288.00 to Km 311.650
23.650 36.5330Strengthening of Muradganj-Ayana-Bijhalpur road (Km 0.00 to 10.00)
13.700 26.3931Widening & Strengthening of Biswan-Laharpur-Hargaon road from Km 0.000 to Km 27.200
27.200 56.6832Widening & Strengthening of Biswa - Mahmuda road from Km 0.000 to 24.830
24.830 56.3933Widening & Strengthening of Lalitpur - Mehrauni road from Km 5.360 to 21.000 and from Km 35.500 to 42.000
22.140 41.4834Widening & Strengthening of Jhansi-Unnao-Balaji road from Km 0.000 to 10.900, which starts from Km 5 of NH-75
10.900 18.6235Widening & Strengthening of Jalalpur- Rampur -Bhagan- Tarun Aahirouli road from Km 0.000 to 22.350
22.350 37.1136Widening & Strengthening of Bisalpur Banda Puwayan Khutar road from Km 21.000 to 32.200
11.20 22.6737Widening & Strengthening of Amroha ring road / bypass from Km 0.00 to Km 35.775
35.775 53.5238Widening & Strengthening of Chunahar Jamui Aaharora road from Km 1.00 to 20.325
19.025 43.6539Widening and strengthening of Nawabganj - Dalelnagar-Baherjageer road from Km 0.000 to 16.000
16.000 27.8240Widening and strengthening of Inayatpur - Ghopa (Fulaona) link road
12.200 10.4741Widening and strengthening of Birsingh - Halapur link road
17.050 18.9042Widening and strengthening of road in Lambua via Kothra Hagiganj, Rajumari to Tatomureni from Km. 0.00 to 15.500
15.500 23.6043Widening and Strengthening from Aligarh Ramghat road to Gaonkheda Godha CTK road from Km 0.00 to Km 15.300
15.300 29.4444Strengthening & widening of Vidhnu-Kisan Nagar Nehar Patri road from Km 1.000 to 18.600
17.600 24.6745Wideing and Strengthening of Chibramau-Kairda road Km.0.000 to 9.800
9.800 21.2646Widening and Strengthening of Lalitpur - Devgarh road from Km 0.000 to 32.300
32.300 53.7747Widening and Strengthening of Jakhora - Rajghat road from Km 0.000 to 19.000
19.000 35.3148Widening and Strengthening of Lalitpur - Rajghat road from Km 0.000 to 21.560
21.560 37.8249Widening and Strengthening of Karahi to Pathra via Goura-Tigodwa from Km 0.000 to 9.000
9.00 4.1350Widening and Strengthening of Baansi Ganguli Chauraha to Gothwa Ghat via Piperhiya from Km 0.000 to 5.000
5.000 2.3651Strengthening of Chilaha- Gopiganj road Km 0.00 to 10.40
10.400 14.3152Widening & Strengthening of link road connecting NH-509 at Narora via Jamuna singh road-Ishampur-Asadpur-Dabathra with State Road 18 (Junawa) (Km 0.00 to 13.100)
13.100 23.9453Widening and Strengthening of Gorakhpur- Pipraich- Kaptanganj road from Km 0.000 to 19.485
19.485 36.7854Widening and Strengthening of Sahajanwan - Bakhira road from Km 0.000 to 23.200
23.200 60.0255Pipiganj - Jasval - Sisai - Sahjanwan road from Km 0.000 to 20.200
20.200 28.3656Four laning of interna lportion of old NH-2 from Km 161.800 to 180.000 (Kokhraj to Manauri)
18.200 127.3257Strengthening of city protionof old NH-93 handed over to State PWD from Umed to Nagla Bhus from Km 0.000 to 10.635
10.635 20.8658Widening and Strengthening of Agra-Jalesar-Sikandramau road from Km 62.000 to 74.4000
10.700 18.0659Widening and Strengthening of Bhojubir-Sindhora road from Km 2.00 to 23.200
21.200 46.7760Widening and Strengthening of link road connecting NH-11 to NH-2 at (Achnera Deen Dayal Dham Farah road)
20.925
41.4461
Widening & Strengthening of Mau to Mohmmadabad road via Yousufpur (Km 0.00 to Km 10.000)
10.000 24.7062Widening of BTIB to Mahowa Dhobha Shahapur road (Km 0.000 to Km 18.000
18.000 27.2563Widening & Strengthening of Shoharatgarh to Palta Devi lin road via Ramwapur Chouraha
5.000 2.1264Widening & Strengthening of Jaunpur-Malhani-Khuthan road (Km 0.00 to Km 27.150)
27.150 32.0265Widening & Strengthening of Kundaha-Sujanganj-MachliShehar-Madiyahoo-Jalalpur-Kerakat-Sultanpur road (Km 0.00 to 27.080 & Km 87.500 to 96.200)
36.080 45.9866Widening & Strengthening of Jivli -Devgaon -Mehnajpur -Aodiyar road (Km 18.440 to Km 33.500)
15.060 15.2367Widening & Strengthening of road from Babatpur-Chaubepur-Bhagtua-Balua bridge (Km. 32.340 to 61.13)
39.350 93.2868Widening & Strengthening of Baburi-Dharauli road (Km 0.00 to 15.00)
15.000 34.6069Widening & Strengthening of Chahaniya-Dhanapur-Mahuji-Jamaniya road
42.000 76.5970Widening & Strengthening of Lalapur Imliya Kanjasa Bhita road (Km 0.00 to Km 23.600)
23.600 32.6671Widening & Strengthening of Pailani-Galauli-Bara road (Km 0.00 to 15.00)
15.000 27.5272Widening & Strengthening of Kaptanganj-Siswan-Nichlaul-Thuthiwari-Nautanwa
73.000 189.8973Widening & Strengthening of Aligarh to Gonda road (Km 0.00 to Km 18.200
16.200 27.0174Widening & Strengthening of Gazi ka bagh Mubarakpur link road (Km 0.00 to Km 13.600)
13.600 17.9775Widening & Strengthening of SMK road to lutar khaur bhaiyya Laxman ka Pura-Meja-Bhatauti road (Km 0.000 to Km 19.250)
19.25 44.5476Widening & Strengthening Delhupur-Raniganj-Patti Kohdaur road (Km 0.000 to Km 61.000)
61.00 117.64Sub-total
1505.313 2780.58ISC Works
1Widening of existing single lane carriageway to two lanes with Strengthening from Km.0.00 to Km 49.00of LalganjHaliyaAndawaManigaraha Road (ODR) upto Madhya Pradesh Border
49.00 98.972Widening of existing single lane carriageway to two lanes Km. 2.50 to Km 36.24 and with two lane paved shoulder from Km. 0.00 to Km 2.50 with Strengthening from Km.0.00 to Km 36.24 of Chopan to MP Border Road (ODR)
36.24 96.053Widening of existing carriageway to two lanes with paved shoulder with Strengthening from Km.0.00 to Km 15.43 of BhabniPokharaAasandeeh Road (ODR) of Distt. Sonebhadrain
15.43 59.42Sub-total
100.67 254.44Total
1706.653 3035Table 11: New National Highways Declared
S N
NH No
Name of Highway
Length in KmDateof Declaration
1
123
Dholpur to Bharatpur 1513.8.2011
2
330
Allahabad-Pratapgarh-Sultanpur-Faizabad-Ayodhya-Nawabganj-Gonda-terminating at NH-730 near Balrampur (Portion from Ayodhya to Balramapur via Gonda) 9631-07-2013
3
334A
Purkaji - Laksar - Haridwar road 1526.02.2014
4
334B New
Meerut - Haryana Border 6004.03.2014
5
219 New
Bihar Border- Chandauli (NH-19) 504.03.2014
6
709A
Haryana Border- Shamli- Budhana- Meerut (NH-34) 9410.03.2015
7
727A
Gorakhpur (NH-27)- Deoria- Salempur- Bihar Border 10010.03.2015
8
227A
Ayodhya (NH-27)- Chhawni- Kalwadi- Barhalganj- Barhaj- Bihar Border 21810.03.2015
9
731A
Near Pratapgarh (NH-31)- Jethwada- Shrangverpur- Manjhanpur- Rajapur- Near Chitrakoot (NH-35) 16010.03.2015
10
330B
Near Gonda (NH-330)- Near Jaewal (NH-927) 4810.03.2015
TOTAL
811
Table 12 : National Highways declared 'In Principle':
Sl. No.Name of Highway / road
Length in U.P. (in Kms)1
Allahabad-Jaunpur-Gorakhpur
170.002
Panipat- Haryan / UP border - Shamli-Muzaffarnagar-Bijnor-Nagina
131.003
Delhi- Saharanpur
170.004
Ghaziabad-Noida-Faridabad-Sohna (Total length= 75 km; Haryana= 57 km; UP= 18 km)
18.005
Nuh-Mandkola-Palwal-Jewar-Bulandshahar (Total length= 60 km; Haryana= 52 km; UP= 8 km)
8.006
Palwal-Aligarh (Total length= 83 km; Haryana= 17 km; UP= 66 km)
66.007Faridabad (Kheri Bridge)-Jasana-Cheersi-Manjhawali-Atta Gujaran-Dankor-Yamuna Expressway (Total length= 25 km; Haryana= 17 km; UP= 8 km)
8.008Guna- Ashok Nagar - Thuban- Piprod- Chanderi - MP/UP Border near Rajgahtdam - Lalitpur - intersecting N-S corridor-Panari-Rajwara-Banpur(MP/UP boredr)-Tikamgarh intersecting NH-539 (Total length = 295; MP= 240; UP= 55)
55.009Nagod- Kanijar- Narayani terminating at junction with NH- 35 between Banda and Chitrakut (Total length = 87 km; MP= 56 km; UP= 31 km)
31.0010Stretch from Bareilly (junction at NH-30 near Civil Lines)- Bhutah -Bisalpur
36.0011Stretch from Bewar (on NH-34) Fatehgarh-Miranpur Katra (on NH-30) Bisalpur (on NH-370)-Pillibhit on NH-730
191.0012Stretch from Nawalpur-Ubhaon crossing- Sikandrapur-Maniar-Bansdih-Reoti-junction with NH-31
108.0013Stretch from Allahabad -Koraon-Drumanodganj-Haliya-Awadhadam-Pipra-Manigarha- UP /MP border- Karondiya-Bagdara-Chatrangi-Singrauli extended up to junction on NH-39 in Madhya Pradesh near Waidhan (Total=176 km,U.P=104 km, M.P= 72km)
104.0014Stretch from Karmaini (junction on NH-24 near Compierganj)-Menhdalwal Kahliabad- Dhanghata- Ramnagar- Nyori (junction on NH-28- Azamgarh
105.0015Stretch form Agra (junction on NH-509 near Islam Nagar-Jalesar-Etah (junction on NH-34 near Police line)
79.0016Stretch from Balia (junction on NH-31 nearTeekha )- Mau-Azamgarh on NH-28
100.0017Stretch from Jaunpur to Khuthan extended upto NH-31 near Saidpur
60.0018Stretch from Palia Shajahanpur via Hardoi -Lucknow
270.0019Stretch from Mathura (NH-44) Hathras-Badaun-Bareilly (NH-30)
215.0020Stretch from Moradabad- UP / Uttrakhand border- Jaspur-Kashipur (Total=58km,U.P=53km, Uttarakhand=5km,)
53.0021Saidpur- Sadat- Jakhania- Jalalabad mor- Mardah
50.0022Tarighat- Bara- Buxar(Uttarpradesh= 38.20 km; Bihar=10.80 Km)
38.2023Akbarpur-Baskhari
23.0024Muzzafarnagar-Jansath-Miranpur on NH 34
40.0025Khurja on NH 34-Jewar
34.0026Meerut-Garhmukteshwar (junction at NH 9)
47.0027Sikandarpur-Ballia
35.0028Jalesar-junction with NH 34 near Sinkandara Rao
25.0029Gorakhpur (junction at NH 27)-Paratawal
32.0030Maharajganj-Nichlaul-Thuthibari road (upto Nepal border)
39.0031Basti-Mehdawal-Kaptanganj
92.0032Faizalnagar-Tamkuhi-extended upto Salempur on NH 727A
52.0033Salemgarh-Sewarhi-Padrauna
49.0034Zamania-Gehmar
21.0035Tamkuhira (NH 28)-Betia (NH 28B)
36.00Total