The scope includes Survey, Design, Engineering, Procurement, Construction of Pump Houses, Laying of Rising & Gravity Mains, Distribution Network and SCADA for controlling & regulating the entire system. The micro irrigation projects will lift 60 cumecs of water from the Narmada River to irrigate the farmlands benefitting 3,00,000 farmers in the process. The state-of-the-art automation system with field instruments and automated valves will ensure round the clock supply of water during the Rabi season.
Powered by Capital Market - Live News