In State of Maharashtra
MEP Infrastructure Developers in Joint Venture with LongJian Road & Bridge Company has emerged as a preferred Bidder (L1) by National Highways Authority of India ('NHAI') for the following Project:Construction of 8 (Eight) Laning of existing 4 (Four) Lane VADAPE to THANE from km. 539.202 to km. 563.000 Section of NH-3 (new NH-848) in the State of Maharashtra to be executed on Hybrid Annuity Mode (HAM).
Key highlights of the Project are as under:
(i)Construction Period:2.5 years from the Appointed Date.
Disclaimer: No Business Standard Journalist was involved in creation of this content