Rail-Cum-Road Connectivity for Sagar Island Deep Sea Port
Capital Market
Kolkata Port has entrusted the work of preparing Detailed Project Report (DPR) with identification of best technological option for crossing of river Muriganga in the proposed new Port at Sagar to National Highway Infrastructure Development Corporation (NHIDCL). Rail-road alignment involving 86.398 hectares of land acquisition has already been finalized.
Sagar Port Project covers railway connectivity between Kashinagar Station and Sagar Port. Eastern Railways has taken up the project of Rail connectivity as a feeder route to Eastern Dedicated Freight Corridor (DFC) from Kashinagar to Dankuni.
Powered by Capital Market - Live News