On 08 June 2014
Reliance Infrastructure through its special purpose vehicle (SPV), Mumbai Metro One (MMOPL) successfully commenced operations of Mumbai Metro on 08 June 2014.The 11.40 km long Mumbai Metro One Corridor, providing connectivity between Versova (Western Mumbai) and Ghatkopar (Eastern Mumbai), reduces travel time from 90 minutes to 21 minutes.
Powered by Capital Market - Live News