The 47.655 km stretch of SH-57 between Chikkamagaluru and Bilikere shall be upgraded to two lanes with paved shoulders under EPC mode at a cost of about Rs 325.86 crore. The project includes 11 minor bridges and 59 culverts.
The 50.06 km stretch of NH-150A between Huliyar to KB Cross and KB Cross to Nelligere shall be upgraded to two lanes with paved shoulders under EPC mode at a cost of about Rs 242.61 crore. The project includes 12 minor bridges and 148 culverts.
Powered by Capital Market - Live News
Disclaimer: No Business Standard Journalist was involved in creation of this content