Nuclear regulator AERB, in a report, has blamed "inadequate draining of hot water" before taking up the routine maintenance work of the valve and said there was no deficiency in its construction.
On May 14, six people were injured -- 3 workers of the NPCIL and 3 contract workers -- due to spillage of hot water during the maintenance of the 3-way hot water inlet valve to a healer loop in the turbine of KNPP Unit 1.
"Preliminary investigation of the incident reveals that hot water spread over the persons during dismantling of the valve of 500 mm size leading to burn injury.
"This was due to inadequate draining of the hot water before taking up the routine maintenance work on the valve. It is concluded that there was no deficiency with respect to the construction of the said valve," AERB said.
Also Read
Sources in ROSATOM, the Russian state atomic agency which has built the reactor, said that when the plant is closed for maintenance, the water should be not released in less than 24 hours, but in the case of KNPP, the accident occurred as the water was drained before that period.
"We had received a request from India for enhanced safety measures. Of course, India had to pay more for such kind of system," said V Asmolov, First Deputy General of Rosenergoatom, a company affiliated to ROSATOM.