Bangladesh's state-owned Petrobangla inked two production sharing contracts (PSCs) with the ONGC and OIL for two shallow water blocks called SS-04 and SS-09 at a ceremony joined by senior government leaders, including Finance Minister A M A Muhith and Prime Minister Sheikh Hasina's energy affairs adviser Tawfiq-e-Elahi Chowdhury.
"We needed to proceed quickly to explore our energy... I hope they (ONGC and OIL) will carryout an aggressive exploration campaign though we may not expect any production in the next five years," Chowdhury told the ceremony.
The ONGC Videsh and Oil are also obligated to spend USD 58 million for block 4 and carryout 2,700 km-long 2D seismic survey, 200 sq km 3D and drill two wells during the contract period.
For the other block they will have to spend USD 85 million and conduct at least 2,850 km-long 2D seismic survey, 300 sq km 3D and drill three wells during the contract period, of which five years will be treated as initial period and the three years for subsequent exploration.
More From This Section
The contractors will be allowed to operate and sell oil and gas for 20 years from an oil field and 25 years from a gas field.
Wellhead gas prices in Bangladesh are pegged to high sulphur fuel oil (HSFO) prices in the international market, while oil prices are determined on the basis of a 'fair market value'.
Under the contract the floor price for HSFO has been fixed at USD 100 per tonne and the ceiling price at USD 200/tonne.
The ONGC and OIL could also sell gas independently to third parties instead of going through state-run Petrobangla and companies will be allowed to market the gas domestically as well, but Petrobangla will have the first right of refusal.