According to a statement by BGR Energy, it has entered into an agreement with Hitachi Ltd, Japan (HTC) and Hitachi Power Europe GmbH, Germany (HPE) on March 30, 2016 at Tokyo.
It has become legally binding with effect from April 29, 2016 upon fulfillment of the conditions mentioned therein.
"The agreement provides for certain payments to be made by HTC to the company in a phased manner over a period of time on achievement of number of milestones/events/transactions so as to realise the objectives mentioned herein above," BGR Energy Systems Ltd informed BSE today.
Besides this, the pact provides for certain arrangement with respect to the future of the JV relationship between HTC, HPE and the company with regard to the existing JV companies -- BGR Boilers Pvt Ltd and BGR Turbines Company Pvt Ltd after completion of the NTPC projects in compliance of the contract and related conditions.
More From This Section
These JVs were formed in 2010 for technical and financial collaboration to make super critical boilers and steam turbines and generators.
BGR Energy Systems stock was trading up 14.37 per cent at Rs 121.00 a piece on BSE.