In a report tabled in Parliament today, the Comptroller and Auditor General of India (CAG) said competition may have been restricted in auction of 11 coal blocks on account of multiple bids by corporate groups made through JVs or subsidiaries.
"Audit could not draw an assurance that the potential level of competition was achieved during...Bidding of 11 coal mines auctioned in the first two tranches," it said.
In a scenario where the standard tender document (STD) allowed the participation of JV and simultaneously limited the number of QBs which could participate in the e-action, Audit could not draw an assurance that the potential level of competition was achieved during the stage II bidding of these 11 coal mines auctioned in the first two tranches.
In the third tranche, the Coal Ministry amended the clause of JV participation with the objective of increasing participation, it added.
More From This Section
"The Delhi High Court has upheld this provision of the auction. It has stated that the process is neither arbitrary or irrational or designed to favour any particular bidder and has worked out well," according to the source.
(REOPENS DEL 34)
CAG said there were errors in computation of floor price of 29 coal blocks auctioned in the first two tranches. It examined the records relating to computation of intrinsic value of 29 coal mines by CMPDIL.
On being asked whether the auditor has recommended for cancellation of e-auction on account of inconsistencies and inaccuracies in the bidding process, Mala Sinha, Director General (Economic and Social Ministries), CAG said, "We have not recommended cancellation of e-auction".
Commenting on under valuation of coal mines an official source said that it was factually incorrect and based on faulty calculations. For example, in Jitpur CAG has assumed moisture content of 5 per cent whereas it is 6 per cent.
CAG further said that out of the 42 schedule II mies, 39 blocks were operational and produced coal and were required to deposit additional levy. The prior allottees were required to deposit Rs 1,0165.12 crore against which Rs 6,628.56 crore only was collected as additional levy till May.
"Thus Rs 3,536.56 crore was pending as additional levy for collection from prior allottees," it said.