"Based on the review of the status of producing coal blocks which have not yet attained PRC (peak rated capacity) and the coal blocks which were likely to commence production in 2014-15 as well as the information/assurance given by the coal block allocatees for achieving production during 2014-15 is 52.925 MT, said the minutes of a meeting held a fortnight back.
The meeting was held under the chairmanship of Additional Secretary, Coal to review the progress of production of the fuel from captive mines in the current fiscal.
Some of the 21 coal blocks which have come under production but not achieved peak rated capacity are Tasra coal block allocated to SAIL, Moher and Moher Amlori Extension mine alloted to Sasan Power and Barjore North coal block of Damodar Valley Corp (DVC), among others, it added.
Of the total 328 coal blocks identified for allocation for captive purposes, the government has so far allocated 218 and deallocated 80 coal blocks.
The demand-supply gap of coal, which increased by 17.9 per cent to 171 million tonnes (MT) in the last fiscal, is likely to touch 200 MT by 2016-17.