Mission Readiness Review (MRR) committee and Launch Authorisation Board (LAB) have cleared the starting of the 29- hr countdown at 1152 hrs, ISRO said.
The launch of Geo-synchronous Satellite Launch Vehicle (GSLV) D6 carrying GSAT-6 is scheduled at 1652 hours on August 27 from Satish Dhawan Space Centre at the spaceport of Sriharikota in Andhra Pradesh.
GSAT-6 is the 25th geostationary communication satellite of India built by ISRO and 12th in the GSAT series.
GSAT-6 provides communication through five spot beams in S-band and a national beam in C-band for strategic users, ISRO said.
Also Read
This antenna is utilised for five spot beams over the Indian mainland. The spot beams exploit the frequency reuse scheme to increase frequency spectrum utilisation efficiency, ISRO said.
ISRO said after satellite's injection into GTO (Geosynchronous Transfer Orbit) by GSLV-D6, ISRO's Master Control Facility (MCF) at Hassan takes control of GSAT-6 and performs the initial orbit raising manoeuvres by repeatedly firing the Liquid Apogee Motor (LAM) on board the satellite, finally placing it in the circular Geostationary Orbit.
The mission life of the satellite is for nine years.