A tunnel boring machine (TBM), with a special cutter head, capable of tunnelling through soil as well as rock, has been commissioned in this regard.
"DMRC MD Mangu Singh formally inaugurated the drive at the underground site in the presence of other Metro directors, the civil contractors on this stretch," a DMRC statement said.
The tunnelling will be carried out primarily under the thickly inhabited areas of the Naval Staff Quarters, Naraina Village and Naraina Vihar at a depth of 14.3 metres, it added.
According to the detailed project report (DPR), the expected daily ridership at the Naraina Vihar Metro station is 13,831.