"The National Highways Authority of India has declared the company as the selected bidder for four laning of Lucknow-Sultanpur section of NH-56 from 11.500 km to 134 .70 km in the state of Uttar Pradesh under NHDP Phase IV on a hybrid annuity basis at a project cost of Rs 2,016 crore," Dilip Buildcon said in a BSE filing.
Shares of Dilip Buildcon closed at Rs 244, up 0.17 per cent, from previous close on BSE.
Disclaimer: No Business Standard Journalist was involved in creation of this content