"... The operations of the (Bilaspur) unit have resumed from January 22," Goa Carbon said in a BSE filing today.
The unit of the calcined petroleum coke producer was shut down on January 10 on account of non-availability of suitable raw material.
Goa Carbon had acquired the calcination unit in 1999 with a capacity of 40,000 tonnes per annum (tpa). Two years later, it had also bought a unit at Paradeep in Odisha having 1.25 tpa capacity. It has another 75,000 tpa capacity in southern Goa.