The satellite with a lift-off mass of 3,164 kg was injected into the intended Geosynchronous Transfer Orbit (GTO) about 43 minutes after a perfect lift-off of Ariane 5 at 3:04 AM (IST) on flight VA-227.
After a flight of 43 minutes and 24 seconds, GSAT-15 separated from the Ariane 5 upper stage in an elliptical Geosynchronous Transfer Orbit (GTO) with a perigee (nearest point to Earth) of 250 km and an apogee (farthest point to Earth) of 35,819 km, ISRO said.
A high power satellite, GSAT-15 is being inducted into the INSAT/GSAT system. GSAT-15 carries a total of 24 communication transponders in Ku-band as well as a GPS-Aided GEO Augmented Navigation (GAGAN) payload operating in L1 and L5 bands.
Providing replacement for the Ku-band capacity of INSAT-3A and INSAT-4B satellites, GSAT-15 will augment and support the existing DTH and VSAT services in the country. The GAGAN payload will meet the in-orbit redundancy requirement for Safety of Life (SOL) operations benefiting the civil aviation services and other users of augmented GPS-based systems in the country.
Preliminary health checks of the satellite revealed its normal health, ISRO said here.
Speaking at the launch facility in Kourou, ISRO Satellite Centre (ISAC) Director M Annadurai said the launch of GSAT-15 will enable ISRO to provide continuity of service to Indian users in Ku-band.