Justice M.Venugopal ordered the notice to the officials, including the PWD Secretary and the Chief Engineer, and posted the case for hearing to November 25.
Petitioner V.Chellasamy, a retired Tehsildhar, submitted that both the dams had reached their maximum levels of 48 feet and 42 ft respectively.
The dams fed water to 30 tanks in and around Watrap village and more than 30,000 acres were cultivated by the water from those tanks.
But no action had been taken so far. Hence, the court should intervene and order for the release of the water to save the crops, he said.