In a written reply to Rajya Sabha, Defence Minister Manohar Parrikar said details including transfer of technology through offsets will emerge after the negotiations are completed.
"The negotiations are underway and IGA and offset contract are yet to be finalized," he said.
The Minister said 36 aircraft being procured will have advanced features like Advanced Electronically Scanned Array Radar, mid-air refuelling and advanced electronic warfare equipment as part of its design.
According to defence sources, the deal is estimated to be around 7.89 billion Euros.
Also Read
Meanwhile in another reply, Parrikar said 18 more Tejas aircraft in IOC (Initial Operation Clearance) standard are planned for induction by 2018-19, besides the two already inducted.
This would be followed by 20 more aircraft in Final Operation Configuration (FOC) standard, which are planned for induction from year 2019.
The total initial sanctioned cost for Full Scale Engineering Development (FSED) for LCA was Rs 5489.78 crore which was later escalated to Rs 9121.07 crore.
The indigenous content of LCA is about 70 per cent and import content is about 30 per cent. The aircraft is indigenously designed and developed and the technology for production of this aircraft is available in the country.
LCA Tejas shall be an important part of IAF's fighter aircraft inventory filling up the lightweight category of fighters and shall be effectively used for air defence and for battlefield air strikes, Parrikar said.