Metro Rail services between two stations here were briefly stopped after an under construction private building caved in near another station.
Services resumed today between Palarivattom and Maharajas stations after track experts certified that the structural stability of metro was not affected after the cave in last night during piling near Kaloor station.
A Kochi Metro Rail Limited spokesperson said services to Maharajas station resumed after their assessment and that a trial run without passengers was successfully completed.
The services between Aluva and Palarivattom continued to be unaffected, she said.
A big crack had occurred on a road near metro pillars near Kaloor following the cave in of the commercial building
Disclaimer: No Business Standard Journalist was involved in creation of this content