The statement said that the detailed project report (DPR) submitted to the National Disaster Management Authority (NDMA) for allocation of Rs 15 crore was yet to be released and the heavy pre-monsoon downpours necessitated taking up preventive works on an emergency basis.
The proposed preventive works included prevention of entry of water into the soil and construction and improvement of drainage system and retaining walls in the strategic locations, the statement said.