"TLDP-III (4X33) 132 MW power station in West Bengal shall be under complete shutdown from January 16 to January 23, 2017 for restoration work of GIS (Line-I Bay)," NHPC Ltd informed BSE today.
Teesta Low Dam-III project was entrusted to NHPC on November 15, 2000. The power station is a run of the river scheme with small pondage to harness the hydropower potential of river Teesta in Darjeeling district of West Bengal.
Disclaimer: No Business Standard Journalist was involved in creation of this content