"Consequent upon successful commissioning, 50 MW (25 X 2 MW) Rojmal wind project at Rojmal, Gujarat is declared on commercial operation from November 10, 2017," NTPC Ltd said in a BSE filing today.
According to the statement, with this development, the commercial capacity of NTPC would become 43,692 MW and that of NTPC Group would become 50,908 MW.
NTPC intends to become a 130 GW company by 2032 with a with diversified fuel mix and a 600-billion units company in terms of generation. The company wants share of renewable energy (including hydro) to be 28 per cent.
Disclaimer: No Business Standard Journalist was involved in creation of this content