Power generation at the 500 MW sixth unit of NTPC in Ramagundam of Karimnagar district was stopped today due to leakage in its boiler tube.
According to official sources, the leakage was found by the crew at around 8.50 AM, following which generation is suspended and measures are underway to resume the same.