Road connectivity between Itanagar and Banderdewa via Karsingsa has been disrupted after a large portion of NH-415 (formerly known as NH-52A) was washed away near Karsingsa. The Hollongi-Itanagar road was also cut off due to the incessant downpour.
"Combating the heavy and continuous rains is a difficult task. However, the department is working round the clock to restore the roads. But there is a major landslide near Karsingsa block point which may take some time," PWD Chief Engineer (Highways), Hage Appa said here.
Gadi, who was accompanied with a host of engineers said the Banderdewa-Itanagar road was the lifeline for the state capital and another vital link, the Itanagar-Hollongi road was also blocked and only the Nirjuli-Gumto was open.
He apprised Chief Minister Nabam Tuki at Naharalgun and sought immediate funds for maintenance work, to which Tuki assured of taking up the matter with the Centre.