During last month, it made 1.87 lakh tonnes of Hot Metal, 1.74 lakh tonnes of Crude Steel and 1.65 lakh tonnes of Saleable Steel, RSP sources said here today.
Besides, the Steel Plant also made 2.91 lakh tonnes of Sinter, 1.34 lakh tonnes of HR coil (Total) and 5103 tonnes of ERW Pipes, which too are above the APP targets.
The Coke Ovens too surpassed the APP by registering average oven pushing of 361.4. Another area in which RSP excelled during the month of April was Techno-Economics.
The Plant recorded a Coke Rate of 524 kg per Tonne of Hot Metal, average Blast Furnace productivity of 1.489 Tonnes per Metre cube per day and Energy Consumption of 6.79 Giga Calories per Tonne of Crude Steel, which are the Best performance for any April since inception.
A major highlight of the month was launching of