The operation was conducted at the International Terminal 2 with the arrival of an A-320 aircraft of Sri Lankan Airlines.
The trial run operations in the domestic terminal-2 was conducted "successfully" in April 2012, an official release said.
The International terminal building, which would have a capacity to handle four million passengers a year, is all set for inauguration soon.