While India's target for 2030 is 500 GW of non-fossil generating capacity, the present grid connected installed capacity (including large hydro) is about 165 GW
Can we really give up on fresh coal-based plants? And still meet the goal of 24x7 electricity for all? A number of connected issues have to be examined before coming to a conclusion