IG Petrochemicals Ltd has informed BSE on December 30, 2013, that the company’s phthalic anhydride plant (PA-1) at Taloja, which was closed in November 2013 to change catalyst, has restarted production and has stabilised operations.
IG Petrochemicals manufactures phthalic anhydride (PA), which is used in industries such as flexible PVC, plastics, paints, construction, transportation, has shut down one of its plants for maintenance purpose.
IG Petrochemicals manufactures phthalic anhydride (PA), which is used in industries such as flexible PVC, plastics, paints, construction, transportation, has shut down one of its plants for maintenance purpose.