Business Standard

Sunday, January 19, 2025 | 03:58 AM ISTEN Hindi

Notification Icon
userprofile IconSearch

HCC bags Rs 167 cr water supply project in Gujarat

Image

BS Reporter Mumbai/ Ahmedabad

HCC, a leading construction, real estate and infrastructure company, has bagged a Rs 167.67 crore engineering-procurement-construction (EPC) contract for the 62.28 kilometer(km) long water supply scheme from Sonaria to Kesaria by Gujarat Water Infrastructure Ltd.

The project that aims to transmit 124.42 million litres per day(MLD) enroute rural areas with over 100 villages in Rajula and Una taluka of Amreli and Junagadh district, will be completed in 18 months time. Water will be drawn from Narmada Main Canal at Kadiali and will be carried through pipeline to Sonaria near Veeraval. HCC will construct a reservoir each at Kesaria and Veeraval and a 62.28 km pipeline connecting these two reservoirs.

 

Don't miss the most important news and views of the day. Get them on our Telegram channel

First Published: Oct 23 2009 | 12:18 AM IST

Explore News