Larsen & Toubro (L&T), in consortium with Patel Engineering, has bagged an order valued at Rs 439.07 crore from National Hydroelectric Power Corporation for the execution of the 520 MW Parbati Hydro Electric Project Stage (III) in Himachal Pradesh. According to a release issued by L&T to the BSE today, the consortium will complete the entire project, which includes river diversion, rockfill dam, intake, desilting chambers, 5.8km long head race tunnel and other associated works, within 56 months. |