The Orissa government today cleared projects worth Rs 1,27, 727 crore in steel, aluminium, power, downstream and ore beneficiation sectors.
The list includes 3 projects in the steel sector, 2 projects in the aluminium sector, 6 projects in the power sector, one downstream unit, and two beneficiation and pelletisation units.
The High Level Clearance Authority (HLCA) of the Orissa government headed by the chief minister, Naveen Patnaik today cleared these projects which had earlier got the nod of the State Level Single Window Clearance Authority (SLSWCA).
Briefing the media after the meeting, the steel and mines minister, Pradeep Amat said, enhancement of the steel capacity of Jindal Stainless Limited (JSL) from 1.6 million tonne per annum (mtpa) to 3.2 mtpa at Kalinganagr Industrial Complex at an investment of Rs 16,266 crore and enhancement of capacity of Visa Steel in the same location from 0.35 mtpa to 1.5 mtpa at an investment of Rs 4995 crore were approved by HLCA.
The public sector aluminium major Nalco’s proposal to set up a 0.5 mtpa alumina smelter and 1260 mw power plant in two phases (840Mw + 420 Mw) at an investment of Rs 16,345.89 crore was also approved. Though the company preferred to set up the project at Brajarajnagar, the location might change. The company is seeking 275.30 hectares of land for the smelter and 575.7 hectares for the power plant.
Similarly, the proposal of the Navayuga Steels for setting up a 12 mtpa port based steel complex at Astaranga in Puri district at an investment of Rs 34,000 crore was cleared by the HLCA. The project will come up in 4 phases and the government will not commit any raw material linkage to it.
Though the company requires 4000 acres of land, the government will assess the land requirement as per the benchmarking report after the company submits the detailed project report (DPR), the minister added.
More From This Section
The public sector National Thermal Power Corporation (NTPC) was given the green signal to set up a 3200 Mw coal based mega power plant at an investment of Rs19,840 crore near the village Gajamara in Dhenkanal district. It requires about 3000 acres of land for the project and will source water from Mahanadi.
However, Jindal Stainless’ proposal to set up 1000 Mw Independent Power Producer (IPP) at an investment of Rs 4090 crore in the same location did not find favour with HLCA with the committee asking the company to change the site of the project.
Other projects which received the nod of HLCA are Rs 6800 crore investment proposal of RSB Metal-tech for setting up 1.4 mtpa alumina refinery, 0.35 mtpa aluminium smelter and 900 Mw CPP at an investment of Rs 6800 crore, Kalinga Energy’s 1000Mw thermal power project at an investment of Rs 4261 crore at Babuchakuli, Arati Steel’s 500Mw thermal power project at Ghantikhal in Cuttack district, Rs 4994 crore investment proposal of Chambal Infrastructures and Ventures Limited for setting up of 1200Mw thermal power plant at Siaria in Dhenkanal district.
Besides, Hyderabad based Lanco Solar’s 250 Mw fully integrated plant to manufacture crystalline silicon solar cells at an investment of Rs 2800 crore in Dhenkanal district, Bhushan Power and Steel Limited (BPSL)’s downstream and ancillary complex in Sambalpur district at an investment of Rs 1953.87 crore, JSW Steel’s proposal to set up 7 mtpa iron ore beneficiation plant and 5 mtpa pelletisation plant at Kamalang in Sundergarh district at an investment of Rs 1450 crore were through in today’s meeting.
Besides, the proposal of Welspun Orissa Steel to set up a 4.5 mtpa beneficiation plant at Nayagarh in Keonjhar district and 4.4 mtpa pellet plant at Dhamra in Bhadrakh district with an envisaged investment of Rs 1963 crore, the proposal of Astaranga Power Company to set up a 2460 Mw power plant at Astaranga at an estimated cost of Rs 11,200 crore were approved by the HLCA.
However, the decision on the 700 mw (Rs 1007crore) power plant proposal of Ind Bharat Energy, 1320 mw (Rs 5604 crore) power plant proposal of Sahara India Power Corporation and the 1100 Mw (Rs 4810 crore ) power plant proposal of Visaka Thermal were deferred.