Graphite India announced that the Karnataka State Pollution Control Board completed the inspection of the plant on 23 November 2018 and has renewed the 'Consent for Operations' for a period up to 30 June 2020 only with condition to shift the unit from the existing location.
The operations to be carried out in the plant are the same as was being done in recent years (except impregnation) and in line with the application made to KSPCB for the consent. The condition will not have adverse impact on the production capacity of the graphite electrode division as a whole in the medium and long term.
Powered by Capital Market - Live News
Disclaimer: No Business Standard Journalist was involved in creation of this content