Installed capacity of NTPC's solar power project goes up to 845 MW
NTPC has commissioned 225 MW out of 250 MW of Mandsaur Solar Power Project of NTPC.With this, the installed capacity of NTPC's solar power projects has become 845 MW. The total installed capacity of NTPC on standalone basis has become 44419 MW and that of NTPC group has become 51635 MW.
Powered by Capital Market - Live News
Disclaimer: No Business Standard Journalist was involved in creation of this content