For a 5.5 MW solar PV plant with tracking system at mines in Madhya Pradesh
Ujaas Energy has received letter of intent from MOIL for design, engineering, procurement, supply, construction, erection, testing & Commissioning of 5.5 MW (AC) Solar PV Plants with tracking system on turnkey basis at Mines in the state of Madhya Pradesh.This order is in addition to the LOI received in December 2016 for 5.00MW (AC) in Maharashtra.
Powered by Capital Market - Live News
Disclaimer: No Business Standard Journalist was involved in creation of this content