Inox Wind today said it has bagged an order for a 100-Mw wind power project at Lahori in Madhya Pradesh from Ostro Energy.
"Inox Wind Limited has bagged an order for a 100 Mw wind power project at Lahori, in the state of Madhya Pradesh from Ostro Energy," the company said in a press release.
ALSO READ: Inox Wind lists at premium on NSE
ALSO READ: Inox Wind IPO subscribed nearly 10 times
ALSO READ: How Inox Wind stacks up against Suzlon
ALSO READ: Inox Wind: Strong business outlook
Ostro Energy is backed by Actis, a global pan-emerging market private equity firm with $7.6 billion of funds under management, it said.
Inox will supply and install 50 units of its advanced 2-Mw DFIG 100 rotor dia Wind Turbine Generators (WTGs) for Ostro Energy on a turnkey basis.
The rotor has one of the highest swept areas that makes it ideally suited to maximise returns, especially in low wind areas, it said.
Inox Wind will be responsible for the entire project lifecycle, from development and construction to commissioning and has also been contracted to undertake operations and maintenance services of the project for a multi year period, post commissioning.
The 100 MW project will be a part of the Inox Wind Park of 200 MW capacity at Lahori, one of many such Wind Parks being developed by Inox across the country.