As part of vigorous campaign launched by PDD in Jammu division to penalise and regularise illegal connections, the department has conducted 4,237 inspections till end of May 2012.
During the inspections, 5,594 illegal connections were regularised and correspondingly 7.96 MW of load was added and regularised, officials of PDD said here.
Besides, a penalty of Rs 153.33 lakh was imposed on defaulters and Rs 82.24 lakh were also recovered, they said.
Moreover, in Bishnah and Miran Sahib rural areas in the Jammu and Samba districts, 860 air-conditioners and 1,259 pump sets having a load of 6.01 MW was added in the month of May and June only, they said.
This campaign of the PDD against the defaulters shall continue till every defaulter is penalised and regularised, officials said.