Tamil Nadu Generation and Distribution Corporation has achieved a new load peaks of performance on June 17, by supplying 292.233 Million Units of electricity and catered to a maximum demand of 13,665 MW.
The previous highest in energy supplied was 289.659 MU on June 14 and 289.541 MU on April 23 and in terms of demand the previous high was 13,091 MW on May 16, Tamil Nadu Electricity Consumers Association said in a release her today.