Aries Agro commissions 100-KW solar power plant
The plant, set up with an investment of Rs 80.51 lakh, will streamline the availability of power for manufacturing operations at its Hyderabad facility
BS B2B Bureau B2B Connect | Hyderabad
“The project was considered essential to reduce the dependence on fossil fuels and erratic grid power supply in the State of Telangana and is expected to also result in an appreciable savings in power and fuel expenses,” said the company in a BSE filing.
More From This Section
Don't miss the most important news and views of the day. Get them on our Telegram channel
First Published: Aug 21 2014 | 6:08 PM IST