Gamesa bags 250-MW wind power project from Orange Renewable
As per deal, Gamesa will deliver two 100 MW wind power projects in Andhra Pradesh and Madhya Pradesh; and 50 MW in Madhya Pradesh
BS B2B Bureau B2B Connect | Chennai
Wind turbine; Photo courtesy: Gamesa
Under this agreement, Gamesa will supply 125 units of G97 – 2.0MW – T104 across the three identified sites. While 100 MW at Ananthapur (Andhra Pradesh) and 50MW at Ratlam are scheduled to be completed by March 2016, the 100 MW project in Agar, Madhya Pradesh is to be commissioned by September 2016.
For the 100 MW project in Ananthapur, Andhra Pradesh, Gamesa will be responsible for providing turnkey solutions where as in the 150 MW Madhya Pradesh, it will be responsible for project supply, erection and commissioning. The agreement also includes a long term operations and maintenance contract.
More From This Section
Sudhir Nunes, chief executive officer, Orange Renewable, added, “We are pleased to announce our second round of projects with Gamesa. With our strong wind resource and technology differentiation this 250 MW project adds substantial value to our growing portfolio and further expands our geographical presence to southern India states. This project reinstates our focus to deliver optimal energy solutions to the country.”
Also Read
Don't miss the most important news and views of the day. Get them on our Telegram channel
First Published: Jul 23 2015 | 9:11 PM IST