Business Standard

Tuesday, December 24, 2024 | 06:48 AM ISTEN Hindi

Notification Icon
userprofile IconSearch

L&T bags Rs 705 crores order for water transmission project in Tanzania

The project will be executed by L&T in a joint venture with Shriram EPC

wastewater treatment plant image via Shutterstock.
Premium

<a href="http://www.shutterstock.co.in/pic-114116221/stock-photo-aeration-of-wastewater-in-sewage-treatment-plant.html?src=kFwEo4_B1JF2I-NC79EHig-1-11" target="_blank">wastewater treatment plant</a> image via Shutterstock.

BS B2B Bureau Mumbai
The water & effluent treatment business segment of the construction arm of L&T has won an order worth Rs 705 crores. The project will be executed by L&T in a joint venture with Shriram EPC.

This engineering, procurement and construction order has been secured from the Ministry of Water and Irrigation of the United Republic of Tanzania for the extension of the water transmission pipeline from the Lake Victoria Water Supply scheme to Tabora, Nzega and Igunga Towns, Package II.

The scope of work involves survey, design, procurement, construction and installation of pumping systems, rising and gravity / main lines, elevated and

What you get on BS Premium?

  • Unlock 30+ premium stories daily hand-picked by our editors, across devices on browser and app.
  • Pick your 5 favourite companies, get a daily email with all news updates on them.
  • Full access to our intuitive epaper - clip, save, share articles from any device; newspaper archives from 2006.
  • Preferential invites to Business Standard events.
  • Curated newsletters on markets, personal finance, policy & politics, start-ups, technology, and more.
VIEW ALL FAQs

Need More Information - write to us at assist@bsmail.in